SAMSER Group | Construction, GIS, Tourism & EV Infrastructure
SAMSER Group | Construction, GIS, Tourism & EV Infrastructure
About usAzCISDevelopment for GreenERATURProjectsContact
SAMSER Group | Construction, GIS, Tourism & EV Infrastructure

SAMSER Group — We see development as our goal, innovation as our path, and integration as the key to success.

Menu

  • About us
  • Projects
  • Contact

Company

  • AzCIS
  • Development for Green
  • ERATUR

Contact

  • 3 Vagif Avenue, Nasimi District, Baku
  • info@samsergroup.az
  • +994125960513
  • +994102390819

© Copyright 2026, All rights reserved.

Developed by:ERAsoft Digital Solutions
  1. Home
  2. Projects
  3. Reconstruction of 10 kV and 0.4 kV Electrical Networks in Hajalli Village, Barda District

Reconstruction of 10 kV and 0.4 kV Electrical Networks in Hajalli Village, Barda District

This project, developed to improve the energy supply system of Hajalli village, is aimed at expanding the technical capabilities of the electrical network and improving the quality and reliability of electricity supply for consumers.

The project solutions were formed based on an analysis of the existing energy infrastructure of the settlement. Modern engineering solutions were applied to organize electricity distribution more efficiently and ensure stable, uninterrupted network operation.

According to the developed plan, the optimal placement of transformer substations of various capacities within the network, reconstruction of supply lines, and improvement of subscribers’ access to quality electricity supply were planned.

During the design process, the geographical features of the area, the location of residential zones, and the prospective development directions of the settlement were taken into account.

Projects

Reconstruction Plan of 35 kV and 0.4 kV Electrical Networks in Gozlukorpu Village, Aghdara District

Reconstruction Plan of 35 kV and 0.4 kV Electrical Networks in Gozlukorpu Village, Aghdara District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Hajimelik Village, Goygol District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Hajimelik Village, Goygol District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Daghli Village, Guba District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Daghli Village, Guba District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Garabaghly Village, Salyan District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Garabaghly Village, Salyan District

Reconstruction Project of 35 kV and 0.4 kV Electrical Networks in Heyvali Village, Aghdara District

Reconstruction Project of 35 kV and 0.4 kV Electrical Networks in Heyvali Village, Aghdara District

Reconstruction Project of 0.4 kV Electrical Networks in Mashtagha Settlement, Sabunchu District

Reconstruction Project of 0.4 kV Electrical Networks in Mashtagha Settlement, Sabunchu District

Reconstruction of 6 kV and 0.4 kV Electrical Networks in Kursangi Village, Salyan District

Reconstruction of 6 kV and 0.4 kV Electrical Networks in Kursangi Village, Salyan District

External Power Supply of the Residential Building at 21 M.A. Rasulzade Street, Khirdalan

External Power Supply of the Residential Building at 21 M.A. Rasulzade Street, Khirdalan

Construction of 10 kV and 0.4 kV Electrical Networks in Gazygumlag Village, Ujar District

Construction of 10 kV and 0.4 kV Electrical Networks in Gazygumlag Village, Ujar District

Kazakhstan-Azerbaijan Tourism Relations Continue to Develop

Kazakhstan-Azerbaijan Tourism Relations Continue to Develop

ERATUR Participated in the IV General Assembly on “Preparation for the Summer Season”

ERATUR Participated in the IV General Assembly on “Preparation for the Summer Season”