Within the framework of the project, the reconstruction of the existing 0.4 kV distribution electrical networks in Mashtagha settlement of Sabunchu district is planned.
The developed scheme includes the placement of transformer substations, routes of new cable lines, installation of poles, and measures for the modernization of the existing infrastructure.
The main objective of the project is to increase the reliability of the settlement’s power supply, minimize electricity losses, and ensure uninterrupted and high-quality electricity supply for consumers.