SAMSER Group | Construction, GIS, Tourism & EV Infrastructure
SAMSER Group | Construction, GIS, Tourism & EV Infrastructure
About usAzCISDevelopment for GreenERATURProjectsContact
SAMSER Group | Construction, GIS, Tourism & EV Infrastructure

SAMSER Group — We see development as our goal, innovation as our path, and integration as the key to success.

Menu

  • About us
  • Projects
  • Contact

Company

  • AzCIS
  • Development for Green
  • ERATUR

Contact

  • 3 Vagif Avenue, Nasimi District, Baku
  • info@samsergroup.az
  • +994125960513
  • +994102390819

© Copyright 2026, All rights reserved.

Developed by:ERAsoft Digital Solutions
  1. Home
  2. Projects
  3. Reconstruction Project of 35 kV and 0.4 kV Electrical Networks in Heyvali Village, Aghdara District

Reconstruction Project of 35 kV and 0.4 kV Electrical Networks in Heyvali Village, Aghdara District

Within the framework of the project, the reconstruction of 35 kV and 0.4 kV electrical networks in Heyvali village of Aghdara district is planned.

The developed scheme includes the routes of new overhead power lines, the placement of transformer substations, the installation of poles, and the works to be carried out for the renewal of subscriber lines.

As a result of the project implementation, the village’s energy infrastructure will be modernized, the reliability of electricity supply will be increased, technical losses will be reduced, and the provision of uninterrupted, stable, and high-quality electricity to consumers will be improved.

Projects

Reconstruction Plan of 35 kV and 0.4 kV Electrical Networks in Gozlukorpu Village, Aghdara District

Reconstruction Plan of 35 kV and 0.4 kV Electrical Networks in Gozlukorpu Village, Aghdara District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Hajimelik Village, Goygol District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Hajimelik Village, Goygol District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Daghli Village, Guba District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Daghli Village, Guba District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Garabaghly Village, Salyan District

Reconstruction Project of 6 kV and 0.4 kV Electrical Networks in Garabaghly Village, Salyan District

Reconstruction Project of 0.4 kV Electrical Networks in Mashtagha Settlement, Sabunchu District

Reconstruction Project of 0.4 kV Electrical Networks in Mashtagha Settlement, Sabunchu District

Reconstruction of 6 kV and 0.4 kV Electrical Networks in Kursangi Village, Salyan District

Reconstruction of 6 kV and 0.4 kV Electrical Networks in Kursangi Village, Salyan District

Reconstruction of 10 kV and 0.4 kV Electrical Networks in Hajalli Village, Barda District

Reconstruction of 10 kV and 0.4 kV Electrical Networks in Hajalli Village, Barda District

External Power Supply of the Residential Building at 21 M.A. Rasulzade Street, Khirdalan

External Power Supply of the Residential Building at 21 M.A. Rasulzade Street, Khirdalan

Construction of 10 kV and 0.4 kV Electrical Networks in Gazygumlag Village, Ujar District

Construction of 10 kV and 0.4 kV Electrical Networks in Gazygumlag Village, Ujar District

Kazakhstan-Azerbaijan Tourism Relations Continue to Develop

Kazakhstan-Azerbaijan Tourism Relations Continue to Develop

ERATUR Participated in the IV General Assembly on “Preparation for the Summer Season”

ERATUR Participated in the IV General Assembly on “Preparation for the Summer Season”