The project developed for Hajimelik village of Goygol district aims to renew the existing power supply system of the area and organize the network in a more rational manner.
The project provides for the construction of 0.4 kV distribution lines along new routes, as well as 6 kV overhead lines that supply electricity to different parts of the village.
Within the framework of the planned measures, appropriate technical solutions will be applied to expand consumers’ access to electricity, optimize the load balance of the network, and ensure more flexible management of the operation process.